I was wondering if there's a away while editing in VMS to auto snap an event to the last split instead of having to drag it all the way back to the last clip in your project. Like, say for example, youve been resizing a clip and where you left off is way back on the other side of the time line and you need it to go back to the last clip. Ive been dragging it back manually please tell me there is a faster way.
Aoto snapping?
noah2112
wrote on 3/31/2009, 3:36 PM