I have a full project edited the way I want it. Now I want to change a certain event in the project, I want to make it slower. The problem is when I do it with the velocity envelope I need to restrech the event to fit so that all the frames of the event appear and thus connect with the next event properly. The problem is I cant do it without dragging all the other events to the right in order to make room for the new slower event. Isn't there a faster way?
Changing an event within a project
tomadonna
wrote on 2/10/2002, 7:17 PM