Is there a way to set a default transition length in VMS Platinum 6? I want to be able to drag a large group of still images to the timeline and have them all be a certain clip length and be linked together through lets say a 3 second crossfade transition. I hope this makes sense. This would save me time, not having to manually overlap all of them.