I recently tried to move some events from the v14 timeline to a second open instance of V13 like I sometimes do in V13 to V13 projects. It seems that doesn't work at all, not even copy/pasting events.
Is there any way to do that or even have V13 load a V14 project?
I sometimes prepare a project by doing a rough edit and sorting of a lot of clips in one project, and then import specific ones into a fresh project by just dragging and dropping them into another open Vegas.