I have a project where I am trying to use two tapes shot simultaneously with their timecodes synched together. Is there a way to import that time code into VV3 so it can be monitored? Is there a way to lock the tape on the time line so it won't accidentally slide around when trying to edit between the two. It's a long project. A high school play. I broke it into two projects -- ACT 1 and ACT 2. Anyone tried this?
Time Code and Two Tapes
pconti
wrote on 4/12/2002, 11:02 PM