I have a 80 minute project with about 60 markers in it. I did the project last winter. I had three or four changes to the project which required me to move most of my markers.
I rendered the project as a DVA Stream and opened the old DVA project, it told me that the project markers had changed and did I wish to reload them. I told it yes.
I have just burnt my first DVD and all the thumbnail menus point to the wrong places. I assume that they are pointing to the old marker locations.
Is there an easy way to fix this?
I tried moving the markers on the timeline from the main menu, but that doesn't work either. The old chapter points seem to be stored with the thumbnail and I have to go into each one separately and reset it.
This wouldn't be so bad, but DVA is running much slower than I remember from last time. It takes a full 45 seconds to reload a thumbnail submenu when I come back into it from adjusting a marker or thumbnail from the timeline. I am easily looking at 2 minutes per marker adjustment time waiting for things to load. (P-III 1GHz Dual with 512 RAM)
Thanks,
Kirk
I rendered the project as a DVA Stream and opened the old DVA project, it told me that the project markers had changed and did I wish to reload them. I told it yes.
I have just burnt my first DVD and all the thumbnail menus point to the wrong places. I assume that they are pointing to the old marker locations.
Is there an easy way to fix this?
I tried moving the markers on the timeline from the main menu, but that doesn't work either. The old chapter points seem to be stored with the thumbnail and I have to go into each one separately and reset it.
This wouldn't be so bad, but DVA is running much slower than I remember from last time. It takes a full 45 seconds to reload a thumbnail submenu when I come back into it from adjusting a marker or thumbnail from the timeline. I am easily looking at 2 minutes per marker adjustment time waiting for things to load. (P-III 1GHz Dual with 512 RAM)
Thanks,
Kirk