I love scenalyzer, but I now I have a client that likes to review the raw footage and he writes down the timecode that he wants to include in the show. This is a great time saver for me but have not found a way to shuffle the tape/and/or do this easily. I was thinking if I could type in the TCI/TCO in a spreadsheet and then import that 'batch' to some program....