I'm making a short 5-min demo video for class that is done (call it "Session 1") but we'd like to try replacing the last 2 minutes of it with a re-edited segment that was composed in a separate VV session (call it "Session 2").
Both sessions are based on the same pool of media clips - Session 2 is just a multi-scene version of a similar single-camera take used in Session 1. All clips were imported from a DV cam by firewire and are in a native AVI format.
Is it possible for me to import Session 2 into Session 1? If there is a way to do this, I can't figure it out. From what I can see, I either (a) have to rebuild Session 2 from scratch in Session 1, based on an edit decision list, or (b) have to render Session 2 into an AVI, and then paste that into Session 1.
While (b) is not a problem, it introduces an additional "generation" of rendering - would this not compromise the picture quality when I render the finished product, since that segment would have gone thru render processing twice?
Please advise if anyone has any info or wisdom. And yes, VV3 just rocks!
Thanks!
AD from Canada.
Both sessions are based on the same pool of media clips - Session 2 is just a multi-scene version of a similar single-camera take used in Session 1. All clips were imported from a DV cam by firewire and are in a native AVI format.
Is it possible for me to import Session 2 into Session 1? If there is a way to do this, I can't figure it out. From what I can see, I either (a) have to rebuild Session 2 from scratch in Session 1, based on an edit decision list, or (b) have to render Session 2 into an AVI, and then paste that into Session 1.
While (b) is not a problem, it introduces an additional "generation" of rendering - would this not compromise the picture quality when I render the finished product, since that segment would have gone thru render processing twice?
Please advise if anyone has any info or wisdom. And yes, VV3 just rocks!
Thanks!
AD from Canada.