Hi,
I know I am missing something really simple but ... I have placed a 30 minute video on the timeline, cut it down to the first 10 mins (for youtube), and rendered it, but Vegas rendered the whole 30 mins, with the final 2/3 being blank with no sound.
How do I trim off the 20 mins of wasted space before rendering so that Vegas knows only to render the initial 10 mins?
I am quite upset that I have spent about an hour playing around and reading the tutorials and manual and still have not found out how to do such a simple little thing!!
I know I am missing something really simple but ... I have placed a 30 minute video on the timeline, cut it down to the first 10 mins (for youtube), and rendered it, but Vegas rendered the whole 30 mins, with the final 2/3 being blank with no sound.
How do I trim off the 20 mins of wasted space before rendering so that Vegas knows only to render the initial 10 mins?
I am quite upset that I have spent about an hour playing around and reading the tutorials and manual and still have not found out how to do such a simple little thing!!