If I want to slide an AVI clip to the left, or right a few frames, it doesn't work. It will slide over about a 1/2 second, or a second at a time. What am I doing wrong? How can I get the clip to move to the left, or right by frames.
I'm not talking about shorting, or stretching, I want to move the entire clip over. Thanks:)