I've got a timelapse clip that I want to adjust the playback speed on at the end of the clip. I want to slow down the playback speed and draw out the last second or so.
What's the best way to go about this? I've tried a velocity ramp but that didn't work. I added some points to the ramp, dragged one of the points downward but then the entire clip didn't play. If I have, say, a 7 second clip, the velocity ramp slowed down the playback but then all of the images don't fit within the 7 second window. I then have to speed up the front end of the clip to compensate.
I know I can split the clip and stretch the last second or so but that makes the entire clip longer.
Is this a case of there being no free lunch?