so i am rendering out from my hd project to dv so i can use the low-rez clip and do audio vo in another instance of vegas.
i did a "render to timeline" in main project.
the time selection as well as the rendered file is
01:40:43:08
when i drag same file to new project it is:
01:40:43:08
but both files read as
01:40:43:07 in Project Media bin
so now getting a time location from master project and pasting location/playback head to proxy project there is about a 1 frame difference. how to get them to be perfectly matched?
i did a "render to timeline" in main project.
the time selection as well as the rendered file is
01:40:43:08
when i drag same file to new project it is:
01:40:43:08
but both files read as
01:40:43:07 in Project Media bin
so now getting a time location from master project and pasting location/playback head to proxy project there is about a 1 frame difference. how to get them to be perfectly matched?