It looks like I'm going to have to rebuild a project in Vegas that was originally done in Premiere, due to a rendering error in Vegas and a lack of EDL options. To try to save myself some time, I'm going to trim the project in Premiere, which will give me the exact clips I need for the Vegas project (so I don't have to hunt through the clips to find the in and out points). However, for safety's sake I'd like to keep a head and tail on the trimmed clips of say 15 frames. Which brings me to my question -
Is there a script for Vegas which would automatically set the in and out points of a clip, so that I can just drag the clip onto the timeline without having to set the in/out points at 15 frames every time?